It's been a week since we've posted -- and very busy at work for both of us, and with the snow and ice storm, not a lot of time for the contractors to do their stuff. Because of the weather they were not able to dig up the driveway as planned so that will be done this week. However as you can see they did get a good start on the inside trim and baseboards -- which we are having done to match the raw/light stain pine we did upstairs. They've done a great job, but it looks like now we'll need to replace the back sliding glass door since it's got a seal leak! Yikes.



The stone people, well not 'STONE PEOPLE' or 'people made of stone', but people who work for the company that will be cutting out stone slab for our counter -- anyway THEY were at the house on Friday and created a template for the kitchen counters and the master bath vanity. It will take about 2 weeks to get the slab ready for installation, and until then we have to work around installed cabinets with no tops.

I wonder if we should move stuff back in yet to the bathroom? Probably not.

The large white box in front is the long-lost shower pan too, which arrived this week. Someday soon they'll start tiling and putting the bath back together too.

0 Comments:
Post a Comment
<< Home